Tesla's dedicated Optimus robot factory at Giga Texas is expanding at a visible pace. Aerial footage captured on July 20 shows the structure has reached 10 column grids in width — roughly 400 to 450 feet (about 130 to 140 meters) running north to south — with construction crews pushing the footprint further in both directions every day.

On the southern end of the site, ground prep work is keeping pace with the steel going up. Fill dirt, geotextile membranes, and silt fences are all active — standard land reclamation steps that signal the foundation footprint is still being enlarged rather than just finished. The pace suggests Tesla isn't slowing down to consolidate before expanding further.
The Optimus factory is being built on the Giga Texas campus as a dedicated production facility for Tesla's humanoid robot program — a line that Tesla has been accelerating aggressively heading into the second half of 2026. How large the final structure will be remains to be seen, but the daily progress visible from the air makes clear that the buildout is far from complete.
🤖 Tracking Tesla's humanoid robot? See every Optimus production milestone and appearance in our Tesla Optimus Tracker.
Related Gear
Gear up your Tesla with tested, custom-fit BASENOR accessories — shop Tesla accessories →
Sources & reporting notes
The links below identify the material source records used for this report.
- @JoeTegtmeyer on X (2026-07-20T11:28:52.000Z) — Direct source
Source links are preserved as published or accessed. See our editorial standards and corrections policy.
The BASENOR Editorial Desk covers Tesla, SpaceX, and related technology, curating reporting from primary sources — official accounts, regulatory filings, and software release data. Every article passes source-record and fact-checking review before publication. About the newsroom.
This report was curated by the BASENOR Editorial Desk from the sources listed above. Read our editorial standards or email editorial@basenor.com to report an error.









